The world of Arcane Earth isn't just layers of dirt and stone... it is alive. Every strike of your tool leaves an impression, every depth unearthed whispers something new. As you descend, the environment begins to change. The colours deepen and strange phenomena start to stir beneath the surface.

At first, you will uncover gentle traces of essence, flickering through the soil like veins of light. But deeper down, the Earth remembers. It hums with dormant energy, restless spirits, and echoes of ancient magic long forgotten. Some layers feel calm and comforting, while others feel watchful, as though something beneath is aware of your digging.

The underground world reacts to your progress. Whispers drift through the caverns, crystals shimmer in patterns that seem almost intentional, and events unfold without warning. Meteor storms, mysterious beacons, and ancient golems will test your resolve as you dig further into the unknown.

  • Click & Dig - Unearth layers of magical terrain, from soft soil to arcane stone.
  • Upgrade Your Tools - Improve power and efficiency with essence and collected blocks.
  • Trigger Random Events - Encounter strange phenomena like whispering winds, ancient beacons, meteor storms and more.
  • Discover Shards - Gather shimmering crystals to unlock powerful magical upgrades.
  • Awaken Golems - Summon loyal Golems to automate digging and aid your journey.
  • Wholesome & Addictive - A cosy experience with satisfying progression.
  • Lore-Rich Tooltips – Enjoy flavourful, humorous, and mysterious messages as you play.
  • Accessibility Options - Including larger font choices and optional visual adjustments for comfort and readability.
  • Catalysts - Special items that influence the world around you, unlocking new ways to gain Essence and the Infusion system.
  • Infusion - A new system allowing you to use Essence and Catalysts to convert blocks and possibly gain a profit.
  • Runes - Discover and harness runic symbols to unlock powerful bonuses and passive effects. 
  • Relics - Unearth ancient artefacts that grant unique traits with some being beneficial and some with curious side effects.

Every click leaves a mark. The deeper you go, the more the world responds... from echoing whispers to glowing veins of essence. Can you uncover the secrets buried beneath Depth 777?


Althought Arcane Earth is at version 1.0, there are still some aspects of the game I would like to add to. Along with bug fixes that may appear.

Here is what's currently being worked on:

  • A full Lumin tutorial - A proper guided introduction to help new players understand the game's systems without feeling overwhelmed.
  • More Arcane Surges - Additional rare and reactive events to make the underground feel even more alive and unpredictable.
  • More Relics and Relic interactions - New Relics and synergies to deepen build variety and replayability.
  • Balance and pacing improvements - Ongoing tweaks to progression, upgrade costs, and difficulty to keep the experience satisfying at every depth.

These features are being carefully tested and balanced before release. As always, development moves at a gentle pace, but each update is crafted with care and a touch of magic.

Have ideas, feedback, or cool features you would love to see?
Leave a comment or message here! Your input helps shape the world of Arcane Earth!


Special thanks to the Arcane Earth community for feedback and testing! A huge thank you to Anthony, Caroline and Kyle!

Font: Khscalafont by Televo


Arcane Earth started as a small experiment, a way to keep my mind busy during tough days. Living with a chronic illness means progress is often slower, but this project has become a space where I can create at my own pace. I am not a professional, just someone who loves the process of building something magical from scratch.


Arcane Earth is completely free to play and made by one person, at a slow and steady pace. If you would like to support the game's development, you can do so through the Download button below. It will take you to the donations page. Every bit of support, feedback, or even a kind comment truly helps keep this project alive. Thank you


Join our discord here!

StatusIn development
PlatformsHTML5, Windows
Rating
Rated 4.2 out of 5 stars
(96 total ratings)
AuthorTimberwolfGames
GenreSimulation
Made withGameMaker
Tags2D, Clicker, cosy, Idle, Incremental, mining, Mouse only, Pixel Art, upgrades
ContentNo generative AI was used

Download

Download NowName your own price

Click download now to get access to the following files:

ArcaneEarth.zip 13 MB

Development log

View all posts

Comments

Log in with itch.io to leave a comment.

Viewing most recent comments 1 to 40 of 68 · Next page
(1 edit) (+1)

The rune says that I'm missing some unlock but I unlocked everything, what am I missing ?

(+1)

Hey Elendar. I really appreciate the commitment you’ve given to 100% the game! That is truly impressive. I am sorry the Garner Rune is being buggy. I’m not sure what’s causing the problem currently but will keep it on my “bugs to fix” list. Hopefully I wake up with less brain fog next time I look! Thank you again!

(+1)

Addictive gameplay loop. Very nice

Impressive! I appreciate you letting me know, thank you!

(+1)

Sweet taste of Victory

That is a lot of Golems! I like it! Very impressive :D

(1 edit) (+1)

I didn't connect the dots on  how relics worked until after I completed the game, I just thought that every relic in my inventory was constantly being applied. When I did notice  the "relic" slots on the screen I thought they were for ascension and I wasn't thinking about my inventory, lul.

Haha sorry, things can definitely be clearer. I got kept hitting my head against a wall with Lumin and thought I’d do it at a later date to help with “tutorials”… That date never came. Thanks for playing though, and for making it to the end! :D

(+1)

i just tried. suppose still some problems with golems? or golems calculations. since game shows one number, in field it looks lil a lil other number. so ive sent golems to last expedition, spawned cheapest to get to 35/35 one.. and got an error on downloadable version. something with their calcs are odd, its like i had 3 golems working in field  when it shown i have 1 or 0

(+1)

I'd enjoy an option to turn off the surges and lucky blocks, or at least keep their frequency restrained to how it is at the beginning. It feels like there's exponentially more of them as time goes on, and it gets to be too much clutter in what would otherwise be a perfect game.

(+2)

i honestly like this game a lot idk what's happening in the comments, yes the terms aren't explained but isn't the point to discover the meanings or am i crazy

(+5)

The readability in this game is easily its most glaring weakness, and one I was unable to move past in the first 5 minutes of gameplay. There is no in game way of seeing what "Cursed", "Harmonic Blossoms", or "Limited Luck" actually mean. Even a simple glossary of named effects would be better than guessing. From reading other reviews and the titles of updates, the relics seem to be an important layer of the gameplay, but it its completely obfuscated. The mechanics clearly have a lot of work put into them, and what I can understand of them is interesting, but the lack of work put into making those mechanics readable makes all that development effort meaningless to the player.  

(+4)(-2)

At first, it looks great, but the more you play, the worse it gets. There's too much fuss and opaque mechanics. There are a lot of tabs with upgrades, resources, and purchases. It's supposed to do something, but in reality, I'm just digging, collecting, and constantly dropping things. I'm constantly collecting, upgrading, and 90% of it doesn't make sense. This is a big problem for the game. When the player doesn't need most of what the game offers. Why play this game at all?

It's sad. You can see that the author tried and put effort into the game.

(1 edit) (+2)

There is a bug in golems numbers. I've sent my golens to expeditions but when they comeback... they don't! They still appear on the map even when i've sent them to explore, but it's like i lose them in numbers (and with that i can't upgrade them).
Making my words smaller, the issue/bug here is that the number of golens doesnt change when i send them to expeditions, like it resets.


Otherwise the game is pretty good!

(+2)

2/10 fissures aren't round enough

(+2)

Hey man keep your fetishs to yourself please 😝

(1 edit) (+3)

Golems not returning from expeditions after claiming the reward is very painful. Also doesn't reduce the cost to rebuy them. Found out when sending 20 of 34 golems out, and afterwards only had 14 golems left.

(+1)

Hey. I am really sorry to hearbthay that. Sorry for your loss. Does reloading the game bring them back by any chance? Trying to figure out why it broke for you. Appreciate you letting me know!

(+2)

It just happened the same to me too lmao, and no, reloading the website doesn't bring them back.

(+3)(-2)

im sorry some people are being so rude in these comments. i'm really enjoying this so far, and while there is some jank and balancing tweaks that could be made, this is still a very fun game and im looking forward to updates!

(+1)

Hey man. That is very kind of you, I really appreciate you taking the time to comment <3

(+2)(-1)

i love when people downvote comments like this because why are you mad at me for being nice lmao

(+2)(-2)

This game is getting worse with each upgrades. More bugs, slower game pace... Golems are ~100x weaker (count in price) than pre-0.2.

Hey, I am sorry to hear that. What bugs are you talking about?

(4 edits) (+2)

For example, I ran into these bugs in a single run in 0.2.2 download version.

1. Golems don't trigger events.

2. Pickaxe doesn't unlock. Its unlock condition doesn't make sense -- instead of reaching rock depth, it requires acquiring rock. As a side effect, golems will never unlock pickaxe.

3. Golems cannot remove snow.

4. Golems eventually stopped dealing damage to blocks (at 3xx white blocks metalic-heart). Depth remain same, and statistics doesn't change. Statistics occasionally update, possibly due to the tiny chance super crit (golem damage rate < 1% player damage rate).

5. Golems statistics is probably too low. 

23 is old bugs since 0.2.

1 is one of the reason that 0.2 golems are so underwhelming (and pickaxe bug).

There was some old bug of blocks keep being unknown on acquiring, which might get fixed in current version.

(+2)

That is amazing, thank you for all the time you’ve put into that list. I really appreciate it!

I think I need to make it clearer in game but to get the pickaxe (for yourself and the golems), you have to defeat 100 heartroot blocks. Sorry for the confusion.

Thank you again my friend!

(+1)

Nice one, albeit the fun ends too soon (2 evenings in my case for max upgrades and 120 runestone golems).  Could use some idle features and automation to replace mundane grind (eg. infusing rock, but cheap catalysts produce slower not less) and prolong the interest at the cost of sleepless binge. At bigger depths the valuable stuff times out before you or golems can get through the host rock, no matter the full upgrades and +400% damage; only high critical chance allows some harvesting. Lunarite holds everything down when it comes to upgrades, would be nice to have some options here. Escape claustrophobia with some alternate areas, perhaps with concentrated deposits to discover. A storyline maybe, an overarching goal or scoring/rating system, so that mining serves some bigger purpose? Liked the graphics and the interface, pretty good one-man job.

(+1)

Hey, thank you very much for your comment! I really appreciate the time and effort you’ve given me here.

I enjoy the ideas you’ve brought forward and have noted them for possible future upgrades. I still have ideas for the story and overall goal, sadly life is tiring at the best of times and progress is lacking.

Thank you again for your time, it is truly appreciated! <3

(+1)

I'm trying to fill out the feedback form in the game, but it seems to have opened inside of the frame that the game is in, where i can't scroll down to the bottom of some of the pages of the form?

I was able to rightclick and then choose 'open frame in new tab' and it worked as expected, but not everyone probably knows that's possible XD  (I'm on firefox by the way) 

The game itself is also reallyyy big on my browser for some reason, I have to zoom out to 80% to see it all.

Hey! Ohh that is a problem, thank you for letting me know. I will add a clickable link in the description for easier access. I’m not sure why the game is so big sadly :(

(+1)

Golems are underwhelmingly weak and overwhelmingly expensive.

Essence*11+Clay*16 almost stuck at depth 50-150, with 80+% cells covered by snow.

Hey, Golems become stronger over time and resources become plentyful, allowing the Golems to thrive in large packs!

- Golem is bugged at snow. Snow that can be removed by single click, takes golem hundreds digs to remove.

- 2nd shard Terranite is magnitudes harder to get than 1st/3rd shard.

In addition, golems are extremely weak. Essence*2+Clay*35 get 0.8 essence/sec at depth 130, only 1/5 of the passive 4/sec generation.

(-1)

yeah, can't start the game, sad

I am sorry to hear that! Big sad. Maybe try a different browser or the desktop version?

(+1)(-1)

continue no work

Hey sorry you’re having an issue with save files. I believe it will be something to do with the browser you are using, possibly… I would recommend using the desktop version!

(+1)

Well the only way to play this right at the moment for me is the chrome version but its all good

I respect the commitment! Sorry you have to go through all that trouble though

eh its fine i spend 30+ hours on cookie clicker

(+1)

this game is is very very fun to have running in the background, thanks for sharing this whimsical little this with the world! i also really love the art style and ui, theres just something special about this

Hey thank you very much! I really appreciate your kind feedback. I will be releasing the new update on the 20th December, with even more polished art! :D

(1 edit) (+1)

Im unsure if im just missing it but it would be nice to have settings. Im having bad fps drops and would like to disable particles and such as its significantly impacted my gameplay.

(+1)

Hey Timko! Sorry, you are not missing it. In this version there are no settings. However the next version will have lots of options to help with any issues you are having. I am also sorry you are having issues with FPS.

(+1)

Ah thanks for the quick reply! I realized after sending my comment that i was also having fps issues with my other games so i restarted my browser and it fixed it, oopsie ^^;

But i would still really like for particles to be decreased, such as the block gains. The highlight on the arrows to switch pages is a bit annoying to me too if its not too much of a trouble to add a toggle for. 

I see you plan to add Milestones? Would those give bonuses for completing? Those have always been my favorite features in games, to hunt down milestones/achievements for perm game boosts.

Im looking forward to the next update now! o/

(+1)

Ohh I am glad to hear you fixed it! Those pesky browsers…

They were annoying, so they have been removed completely! And the rest has been added to the options page to better suit everyones accessibility.

Yes! Milestones will be in the game. They are called Runes and each Rune has a few steps to being complete. Each step rewards you with either permanent boosts or instant rewards. Some even enhance your Golems!

I really look forward to sharing it all with you. Take care for now and… see you back here on the 20th December ;) o/

(+1)

got all possible upgrades. cool game, waiting for more!

Amazing! Thank you very much!

(+1)

this is an amazing game!


but i have noticed that from 500 downwards, it appears to be only runestone. i cant seem to find this stated anywhere, and i am running out of everything else

Hey Lynx, thank you very much!

Yeah sadly Runestone is the limit for this current version, along with the final upgrades. I appreciate you got to depth 500 though, that is very impressive!

i didnt see this at the time, so ive continued down to 954 lol

very fun!

(1 edit)

I gave up at 800 before double checking lol

(+1)

Hello! Haha I love this game. Could I ask how you managed to get save files working on itch webGL? 😍

Hey there! Thank you! I use GMS1 and although it was a struggle to start as I’d never saved like it before, I use simple .ini files that save onto your local drive. It is really simple, easily “hacked” but works a treat and lets me hold all the games information that needs to be saved quickly and at a low memory cost. I see you use Godot? I’d like to think there is a similar way for that engine to do so too! (Btw I love your artwork, it is adorable!)

(1 edit) (+1)

Do shovel/pickaxe upgrades work on golems? (Golems can dig stones without 1st pickaxe upgrade)

(+1)

Hey! In the current version, both shovel and pickaxe upgrades make your Golems stronger but there is a slight bug where the Golems can mine stone without you purchasing the Pickaxe. This has been fixed in the next update!

(1 edit) (+1)

The chance that golem digging at edge/corner is sort of too low, which makes the ground ... IMO ugly. (e.g. depth 500 vs 300 vs 120)

It sure is ugly… I heard the Golem’s don’t like the mine near the edge incase they fall off! I will have words with them ;)

(+1)

Hey, the AutoMine Option is really Refreshing! Sadly I had to wait a long time for the Witchrock for some upgrades, because I built too many Golems and the whole field was full of Runestone.

I added Arcane Earth to IGDB (Internet Game Database by Twitch). If you like, feel free to add or correct information about the game and vote for the changes. (As the Developer of the game you can get yourself verified.)

https://www.igdb.com/games/arcane-earth/changes

Hey there! Thank you for your comment, I am glad you found the AutoMine option refreshing! Sorry to hear you found it a long time between Golem upgrades. Hopefully in the next update, it will feel more balanced.

I appreciate you posting the game on IGDB! That is very kind of you. It looks like it has been taken down however. Maybe once I get the next update out I will take a look at posting it on there properly.

(+1)

Hey, thanks for the reply. As far as I can tell the changes were not discarded. I created a new entry for the game and that's why it is pending. This review process will take a few months without more votes on the changes (because it's priority based). As a developer, you can get yourself verified, which results in an increased priority for IGDB Reviewers when you submit changes to the IGDB entries. So if you are releasing new screenshots after a new game update it would be advised to upload them as changes by yourself (and replace the old ones I took from this page).

(+1)

It must be me, is there no sound?

It is not just you! The Golems hum in silence… There is no sound in this version sorry to say. Next one will have sound though!

(+1)

The premise seems interesting, but I'm having trouble with how small the text is :(

Hey, thank you for the message. Although it seems far from now, the new version has better accessibility options, the main one being font size. Sorry for the meantime!

(+1)

Coming back after months of trying it out last time half a year ago (ikr?? it's been half a year since I last tried this game out!) and I see a visible glow up and increase in the amount of content there is (I'm currently around 750+ depth). Automine is pretty nice to have and automation in the form of golems really do fit the theme of an Arcane. I'm hyped to see what infusions and milestones will be once they're released slowly but surely for game progression.

My current suggestions at this point have changed seeing how much it has been growing, though I don't have a lot, here's at least one of my suggestions:

Crystals seem to stack up very easily while the era of using pickaxes do give a temporary slowdown, and considering that I've seen a lot of things that are benefits for having automation so I'd like to suggest having active spells to benefit active playstyles as well, starting from once you have access to weathered stone, you can unlock spells that cost crystals (they scale up quickly due to how much you'd get later on), and if you're going to roll with it, up to you what they will do!

It feels refreshing coming back, restarting my old progress to see how much the start has changed, please keep it up!

Hey, I really appreciate the energy and time you’ve given me here. A huge thank you!

I never considered how easy the shards stack up, and you’re absolutely right. I have tweaked them a little to get less.

I love your idea about magic and spells, again something I had not considered. I will put your amazing ideas into the future update ideas and have a good think about how to implement balanced spells!

I am working on a massive update for the game currently, one that will hopefully make you feel like you’re playing a brand new game if and when it is released and you return to the Arcane Earth. Progress is slow but steady and I am inching ever so close to the end… not long to go…

I really appreciate your feed back, thank you again!

(+1)

why is grass not a block

(+2)

Grass is a figment of our imaginations! Whoever says touch grass is lying to you… Play more Arcane Earth…

get out

(+1)
 I think i need more golem or do less

More golems for jeffcat!

(+1)

Love it! Having loads of fun here

Perfect, thank you!

(+1)

love this game :D

Amazing to hear! Thank you!

(+1)

Great game, Im having loads of fun. The only problem is this:

 

46million health rootweawe that appeared after a sandstorm was followed by a mole

 

Hey, thank you!

46 million health on anything should definitely not be a thing, that is crazy! Then a mole attack to top it off… Sorry!

(1 edit) (+1)

I actually got one with 250 million. It was incredibly annoying at first but just disappeared after a while. 

(+1)

I loved this game! Keep up the great work

Beautiful, thank you! I really enjoyed watching you play it!

(+3)

The text is very small, fuzzy, and hard to read, especially in the tutorial.  Is there supposed to be a soft block after rootweave, because I have a space marked ???

Hey, I am sorry for the difficult to read font. I am making slow progress on moving forward finding a fix for this.

As for the hidden block, keep clicking and you’ll find it!

(+1)

Great game. I have like 500 golems lol, but something seems to have bugged at about depth 550 as i have a bunch of topsoil/rich dirt that's popped up with 15m durability... Might not be a bug but it's not consistent like its a layer so i'm on the side it might be a bug. 

(+1)

Also late game there's a huge need for golemclay to upgrade golems and no way to get it consistently may be worth a look at some point.

That’s some durable soil… Definitely shouldn’t be like that! Thank you for pointing that out.

The issue with needing older blocks for golem upgrades is in the pipeline but thank you for the feedback!

(+1)

Pretty good game here so far

Hey that’s great to hear, thank you!

(+1)

Welp, I think this is everything done, pretty cool game.


(+1)

Woah. That is some amazing stats! Everything is definitely done! Thank you very much!

(+1)(-2)

Always a shame when someone hacks a game.  

And even worse when they post a picture of their hack.

(+1)

Oh my sweet summer child, I WISH that it was hacked....

Viewing most recent comments 1 to 40 of 68 · Next page